Winter project... get the west end of the railroad functional!
The above picture is looking along the new benchwork from where it connects to the existing benchwork. Along here will be west mainline staging at the lower level, and Raleigh yard on the upper level as well as the wye at the far end.
Above is an elevated view of the new benchwork in the corner... you can see where the staging will be (4 double-ended, double-trainlength tracks) the access hole in the middle, and the upper benchwork for the yard and wye.
Above is a closer view of this area with some flextrack and stand-ins to better visualize the scale of it.
Time to hit the hobby shop for their entire stock of track... about five times over, the way the supply of track has been for the past few years.
Monday, January 18, 2016
Saturday, January 9, 2016
Wet paint
With the weather turning into "modeling season", I figured I'd try to get things moving again in the basement. I'd stopped building benchwork just short of Raleigh yard and west mainline staging (Charleston / Handley / Thurmond) because that side of the basement hadn't been painted yet. Well, today I hung plastic and fired up the paint sprayer.
Top level will be Raleigh yard on the Piney Creek branch, below will be the west mainline staging and return loop.
I plan to build it to allow expansion to continue, including the branch up to Pemberton for interchange with the Virginian.
Top level will be Raleigh yard on the Piney Creek branch, below will be the west mainline staging and return loop.
I plan to build it to allow expansion to continue, including the branch up to Pemberton for interchange with the Virginian.
Sunday, January 3, 2016
Clutter
I believe one key to having an enjoyable model railroad room is avoid clutter.
I guess I failed that one. I'm working on it though.
I guess I failed that one. I'm working on it though.
Saturday, November 7, 2015
Simplify.
In the previous post back in March, I was considering my options for what to include in the layout. I've had a very busy year and don't expect things to slow down anytime soon, so I think the buzzword is "simplify".
Mainline west of Prince at this time will go to staging under Raleigh, along with a return loop to allow continuous run (perhaps I'll have this layout on the Piedmont Pilgrimage someday?). The Piney Creek branch will go to Raleigh yard, and eventually may reach Pemberton for that junction with the Virginian. Eastbound on the mainline past Quinnimont will temporarily go to a return loop until the design for that end of the layout is finalized.
The most recent work has been simply trying to make headway on organizing the room. Lots of shelving for books and other curiosities under the layout makes it feel more inviting and less like a storage room.
The desk/workbench in the foreground is attached to the wall and the work surface can fold down out of the way when working on the layout.
Mainline west of Prince at this time will go to staging under Raleigh, along with a return loop to allow continuous run (perhaps I'll have this layout on the Piedmont Pilgrimage someday?). The Piney Creek branch will go to Raleigh yard, and eventually may reach Pemberton for that junction with the Virginian. Eastbound on the mainline past Quinnimont will temporarily go to a return loop until the design for that end of the layout is finalized.
The most recent work has been simply trying to make headway on organizing the room. Lots of shelving for books and other curiosities under the layout makes it feel more inviting and less like a storage room.
The desk/workbench in the foreground is attached to the wall and the work surface can fold down out of the way when working on the layout.
Sunday, March 22, 2015
Which direction to go?
I've been playing with track planning and whatnot tonight, and I'm coming to a fork in the road with this layout. I've kept aisleways huge and compression very minimal so far, and in some ways that has come back to bite me. There's two ways I can take the design from here, and they're explained below.
1. Increase level of compression dramatically for future additions, add helixes, and increase grades on the layout. Hinton yard would be awkwardly crammed into a corner over the washer/dryer. Meadow Creek would also be seriously crammed into who knows where, if I could fit it at all. Its branch would be nothing but a staging stub. Thurmond would be just a little stump of a layout segment bereft of its yard, or at most a couple stub-ended tracks tucked under another scene.
2. Maintain the current open-room feel and linear flow to the layout, but some iconic locations (Thurmond, Hinton) would be present in name only as staging areas. Beyond the current Prince and Quinnimont segment, I'd have Piney Creek branch up to Raleigh yard, the wye, staging for the branch going towards Beckley, and a continuation of this end of the layout across the VGN diamond at Pemberton, WV (complete with display loop for VGN trains) to the jointly-served Affinity mine. I'd probably have room for a decent representation of Meadow Creek and may be able to include some of the NF&G in reasonable form as a second deck or "mushroomed" area.
I started out with a LDE based on a location near Hinton, but soon switched to Prince and Quinnimont as being center stage for the layout since that area along with the Piney Creek branch could stand alone as a decent layout. I still have the CW Cabin (Hinton) LDE, it has suffered some storage wounds but would be ready to go with some minor repair and track cleaning. But on the other hand, I could gut it for its switch motors and such, and call it an experiment that is now over. There's only so much I can fit in half a basement (other half is the garage, and that's a whole 'nother ballgame... not even my layout is allowed to take over the garage!)
1. Increase level of compression dramatically for future additions, add helixes, and increase grades on the layout. Hinton yard would be awkwardly crammed into a corner over the washer/dryer. Meadow Creek would also be seriously crammed into who knows where, if I could fit it at all. Its branch would be nothing but a staging stub. Thurmond would be just a little stump of a layout segment bereft of its yard, or at most a couple stub-ended tracks tucked under another scene.
2. Maintain the current open-room feel and linear flow to the layout, but some iconic locations (Thurmond, Hinton) would be present in name only as staging areas. Beyond the current Prince and Quinnimont segment, I'd have Piney Creek branch up to Raleigh yard, the wye, staging for the branch going towards Beckley, and a continuation of this end of the layout across the VGN diamond at Pemberton, WV (complete with display loop for VGN trains) to the jointly-served Affinity mine. I'd probably have room for a decent representation of Meadow Creek and may be able to include some of the NF&G in reasonable form as a second deck or "mushroomed" area.
I started out with a LDE based on a location near Hinton, but soon switched to Prince and Quinnimont as being center stage for the layout since that area along with the Piney Creek branch could stand alone as a decent layout. I still have the CW Cabin (Hinton) LDE, it has suffered some storage wounds but would be ready to go with some minor repair and track cleaning. But on the other hand, I could gut it for its switch motors and such, and call it an experiment that is now over. There's only so much I can fit in half a basement (other half is the garage, and that's a whole 'nother ballgame... not even my layout is allowed to take over the garage!)
Saturday, March 21, 2015
DCC equipment install
I rolled around a few ideas for what to do with the DCC system components. I wanted something elegant and "built in", not just the command station and related items stuffed on a shelf somewhere. Originally I had settled on a small wall-mounted 19" IT/telecom rack, but last night the design for this simple beauty hit me. I sat and pondered it a while, and this morning I went to get some lumber and put it all together. It beats the cost and unnecessary complexity of the rackmount idea.
This is located under the Prince, WV portion of the layout. Removal of two screws allows it to swing down for service. I wanted a single power switch for the entire layout. That's on the left side, light switch with indicator light. I built this with two holes for Digitrax boosters, although I only have one at the moment. I plan to add a DCS100 and split the layout into two power districts. Also visible is the Locobuffer USB, I mounted it to be visible because of the status LEDs on it. Originally I'd planned to use a dedicated Linux PC as a JMRI server, but since I have another machine just a few feet away (and it's on almost 24x7), I'll just use it instead. Just need to round up about a 12-15 foot USB A-B cable.
This is located under the Prince, WV portion of the layout. Removal of two screws allows it to swing down for service. I wanted a single power switch for the entire layout. That's on the left side, light switch with indicator light. I built this with two holes for Digitrax boosters, although I only have one at the moment. I plan to add a DCS100 and split the layout into two power districts. Also visible is the Locobuffer USB, I mounted it to be visible because of the status LEDs on it. Originally I'd planned to use a dedicated Linux PC as a JMRI server, but since I have another machine just a few feet away (and it's on almost 24x7), I'll just use it instead. Just need to round up about a 12-15 foot USB A-B cable.
Saturday, February 28, 2015
Putting on a pretty fascia
The Piney Creek branch received its fascia today.
Also in the left of this pic, you see I have completed benchwork to the corner, just beyond which will be Raleigh yard. Underneath that yard the mainline will continue towards Thurmond. Ignore the mess, please.
Next, I have a detail shot of the fascia showing Digitrax UP5, New Rail Models throttle pocket, notch for the creek bed, and the "portholes" for viewing/accessing the mainline. Of course, the top of the fascia is not cut to its final profile... that'll happen as scenery begins to take shape.
Also in the left of this pic, you see I have completed benchwork to the corner, just beyond which will be Raleigh yard. Underneath that yard the mainline will continue towards Thurmond. Ignore the mess, please.
Next, I have a detail shot of the fascia showing Digitrax UP5, New Rail Models throttle pocket, notch for the creek bed, and the "portholes" for viewing/accessing the mainline. Of course, the top of the fascia is not cut to its final profile... that'll happen as scenery begins to take shape.
Subscribe to:
Posts (Atom)








